"Tongque Terrace" is popular, "Bath Girl" Liu Yifei’s nude play provokes controversy


Liu Yifei becomes a "bath girl"


 Cao Pi’s harem forcibly occupied Fuhou

    The Three Kingdoms epic was released nationwide at midnight on September 26. Due to the magnitude of the annual drama, "Tongque Terrace" accounted for more than 30% of the national screen that day, becoming the champion of film placement. The considerable attendance also broke the silent viewing slump period for many days. Since September 26, "Tongque Terrace" has become a hot topic on the Internet. Overall, the quality of the film, the sound and painting effects have been unanimously recognized. "Zhang Yimou’s luxury team has once again created a gorgeous effect", followed by acting as the most recognized part. It is generally believed that "Zhou Yunfa’s Cao Cao is invincible, Liu Yifei’s acting has broken through, and Su Youpeng is the highlight." Historical issues and passionate plays have become the point of complaint, especially a play in which men and women bathe naked, which has caused a lot of controversy.

The acting collective broke out, Zhou Runfa was invincible, and Su Youpeng was brilliant

    In many discussions, the acting skills of the lead actor have been almost unanimously praised. Cao Cao, played by Zhou Runfa, completely subverts the inherent image of the past. He is capable of writing and martial arts, but also good and evil. He has established an emperor and chased after a beautiful woman. Users can’t help but exclaim "It turns out that Cao Mengde is such a affectionate and attractive uncle". At the same time, Su Youpeng, who is "the most incompetent emperor in history" and "the voice of the Three Kingdoms", also received comprehensive praise. Some netizens commented: "Su Youpeng is very amazing. The Book of Songs sings very well. After acting this film, he directly entered the ranks of performing artists." Regarding Liu Yifei’s acting skills, some netizens praised: "Liu Yifei, who played two roles and challenged the beautiful woman Diao Chan, has also improved a lot this time." And the ambitious queen Yi Nengjing who played erotic, the wretched and cunning Qiu Xinzhi, and the wonderful drama of the old actor Yao Lu and Ni Dahong were also well received. 

Next page: Large-scale group nude plays are criticized, and Liu Yifei’s "bath girl" plays hold different views

Where is the best road condition of Zhejiang national and provincial highways in 2023? Let’s watch together!

A few days ago, the Zhejiang Provincial Department of Transportation announced the test results of national and provincial highways in 2023. What is the quality of road conditions in various places? Let’s watch ↓↓↓

Road condition quality of national and provincial highways

The lane mileage of this test is 24,717 kilometers, the average PQI of national and provincial highway pavement technical condition index is 93.44, the excellent road rate is 99.29%, the average PCI of pavement damage condition index is 94.45, and the average RQI of pavement driving quality index is 92.75.

Highway condition quality

The mileage of expressway inspection lane is 10812 kilometers, the average PQI of expressway pavement technical condition index is 94.94, the excellent road rate is 99.89%, the average PCI of pavement damage condition index is 96.82, the average RQI of pavement driving quality index is 93.92, and the average RDI of pavement rutting depth index is 95.60.

Road sections that have been open to traffic for more than three years

Within three years of opening to traffic.

Road quality of ordinary national highway

The mileage of inspection lane of ordinary national highway is 8197 kilometers, the average PQI of pavement technical condition index of ordinary national highway is 92.70, the excellent road rate of PQI is 99.22%, the average PCI of pavement damage condition index is 93.19, and the average RQI of pavement driving quality index is 92.10.

Road quality of ordinary provincial highway

The detection lane mileage of ordinary provincial highway is 5708 kilometers, the average PQI of pavement technical condition index of ordinary provincial highway is 91.66, the excellent road rate of PQI is 98.03%, the average PCI of pavement damage condition index is 91.80, and the average RQI of pavement driving quality index is 91.49.

Next work requirements

Continue to increase investment in maintenance projects.

Municipalities should attach great importance to poor road sections and continue to increase investment. Where the technical condition index PQI of expressway pavement is less than 92, and the technical condition index PQI of ordinary national and provincial highways is less than 80, the municipality shall put forward corresponding rectification measures and give written feedback. It is necessary to formulate a scientific and reasonable maintenance plan, implement control measures, and make every effort to improve the quality of road conditions.

Strengthen the management of maintenance project plan

The maintenance project plans of expressways and ordinary provincial highways should be worked out quickly, and all units should make in-depth analysis of the test data, make scientific decisions, ensure the right medicine, and effectively improve the road conditions. Do a good job in the implementation of the common national highway maintenance project plan, popularize and apply the "four new" and energy saving and emission reduction technologies according to local conditions, standardize the management of maintenance projects, and complete the review and approval of design documents before the end of May 2024.

Strengthen industry supervision and implement supervision and guidance.

Municipal transportation departments should earnestly perform their duties of industry supervision and guidance, strictly supervise the business units and road sections that are not in place and have poor road quality within their respective jurisdictions, and urge all maintenance measures to be put in place.

Further strengthen the quality control of maintenance projects.

All units should further strengthen the quality management of maintenance projects, strictly implement the maintenance construction specifications and operating procedures, strengthen the quality sampling of raw materials and construction process, and strictly implement rectification measures for problems found in the construction stage and quality defect period.

Original title: "Where is the best road condition of Zhejiang national and provincial highways in 2023? Let’s watch together! 》

Read the original text

Zoo under live camera: Is "cloud adoption" an urgent solution?

  BEIJING, Beijing, November 16 (Wei Xianghui) Recently, Nanjing Hongshan Forest Zoo caused a heated discussion due to live fundraising on the online platform and the opening of "cloud adoption". Some people think that the zoo’s move is related to the difficulty in revenue under the epidemic.

  In fact, in recent years, many zoos have tried to "touch the net" to transform. Experts say that investing most of the income from adoption and live broadcast into zoo management and construction is beneficial to animal protection, but the regulatory issues behind this are also worthy of attention.

  Many zoos’ income dropped sharply due to the epidemic.

  According to the latest information of the "Let It Go Wild" project initiated by Hongshan Forest Zoo on the Tik Tok platform, Hongshan Forest Zoo has completed the fund-raising target of 2.64 million yuan for live broadcast, and the number of donations has reached 180,019.

  Hongshan Forest Zoo is a self-supporting public welfare unit. As mentioned in the introduction of "Let It Go Wild" project, "As a self-supporting public welfare unit, Hongshan has to face the unbalanced reality between income bottleneck and the improvement of animal welfare protection under the restriction of personnel flow for more than two years."

  In addition to live broadcast fundraising, Hongshan Forest Zoo also launched a small program "Cloud Adoption" activity last year. The public paid a certain fee, signed an adoption agreement with the zoo, and then watched their adopted animals through live broadcast and other forms. Many netizens believe that this is also related to the operational difficulties of Hongshan Forest Zoo.

  The epidemic did "hit hard" the zoo. According to the news released by official website of China Zoo Association in July this year, the 2022 meeting of the association’s management committee revealed that the zoo conditions reported by the association’s cooperation areas showed that during the epidemic period, the zoo closed its parks from time to time. In the first half of 2022, one third of the zoos took measures to close their parks, some of which lasted for 120 days, and "the annual income of many zoos decreased by 50%-70%".

  Screenshot of live broadcast of Hongshan Forest Zoo.

  Can "touching the net" help out?

  Hongshan Forest Zoo, as a zoo that came into contact with the network platform earlier in China, has many business ideas that are often concerned by the outside world. According to reports, in 2018, Hongshan Forest Zoo began to test the live broadcast of water on various platforms. In addition, Hongshan Forest Zoo also created Zoo Mall and put on shelves peripheral products.

  According to media reports, in the past two years, Nantong Forest Wildlife Park, Xining Wildlife Park, Qingdao Forest Wildlife Park and many other zoos are trying to "touch the net" and promote adoption and other activities on social media.

  Qingdao Forest Wildlife Park launched animal adoption activities in 2020. Li Huanbin, Minister of Planning Department, told the media that the average adoption fee for small animals is 1 yuan per day, and the annual adoption fee for large animals is 1000 yuan. However, during the closure of the park in 2020, the zoo lost more than 10 million yuan. In contrast, the adoption fund is far from covering the operating costs of the zoo.

  Yang Zhaoxia, director of the Ecological Law Research Center of Beijing Forestry University, told Zhongxin.com that this issue should be taken seriously by the society and relevant departments. Li Huanbin once admitted to the media that the return to normal operation behind the zoo is inseparable from the support of the higher authorities, the Forestry Bureau, the Cultural Tourism Bureau and the local government. However, he also said that adoption is more important to play a role in popular science education.

  In fact, as early as 2010, the Opinions on Further Strengthening Zoo Management issued by the Ministry of Housing and Urban-Rural Development clearly mentioned that it is necessary to actively guide all sectors of society to support the development of zoos through donations and adoption. In addition, the opinion also pointed out that governments at all levels should not regard the zoo as a "financial burden", but should give full protection in terms of funds, institutions and policies.

  Expert: The use of fundraising amount should be made public.

  Chen Juanli, director of northwest university of politics and law Animal Protection Law Research Center, told Zhongxin. com that offline or online adoption does not mean giving the ownership of animals to tourists, but an act with a contractual nature. We can analyze whether the adoption content is legal from the perspective of contract law. Under this premise, the zoo should comply with the Wildlife Protection Law when setting up adoption projects. For animal live broadcast, it should also be carried out in accordance with the relevant laws and regulations of the network platform.

  "If most of the income from adoption and live broadcast is invested in zoo management and construction, it will be beneficial to animal protection." According to Chen Juanli, animals in zoos belong to recreational animals from the legal point of view. At present, academic circles have been discussing this part of the animal welfare law and animal protection law. She said that after the introduction of relevant legislation, the regulations on zoo management will be further improved.

  Yang Zhaoxia said that the relevant departments should verify whether the zoo really encounters operational difficulties and whether financial subsidies are in place. He mentioned that from a legal point of view, the amount and use of fees obtained from animal adoption and live broadcast should be made public.

  For zoos that offer webcasts, Yang Zhaoxia believes that the wildlife protection management department can supervise these zoos in a unified way, such as issuing relevant licenses and increasing filing. "A long-term and stable mechanism should be formed." He said. (End)

Ten years of Warcraft players shouted: It’s Blizzard’s turn to kneel down and ask Netease to get back together.

Original yanye AI lanmeihui

Author | Yan Ye Editor | Wei Xiao

When I saw the tag of # Netease Blizzard Composite # rushing to the hot search, Dong Fang, a player of Warcraft for ten years, had no waves in his heart.

After all, she has experienced too many "wolves coming" this year.

According to her rough calculation, in the year when Netease Blizzard broke up in China, there were more than a dozen domestic game manufacturers, large and small, who had an affair with Blizzard. For example, in November, it was reported that Tencent would take over Blizzard, but before the players rubbed their hands and expected it, Tencent’s rumors came. Similarly, before Blizzard, China represented Jiucheng, ByteDance, Perfect World and other game manufacturers.

(Screenshot of Dong Fang’s circle of friends)

"The most outrageous thing is that even the Oriental Pearl Group has heard that it will pick up Blizzard, which is the company of Shanghai Tower!" She said angrily, "It seems that our players are a group of fools who are easy to fool."

Dong Fang said that although players have already been trained to distinguish between true and false information, they will still expect the return of Blizzard in rounds of news.

At the beginning of December, Lvge, a well-known anchor in Hearthstone District, said that Blizzard would officially return to China on December 15th, and Huang Xudong, an e-sports anchor, also revealed relevant information. The voice of several authoritative KOL made players think they saw hope, but it was finally proved to be false by time, and Lvge’s live broadcast room was besieged by players who hoped to be shattered again.

After all, these sticky players still miss Blizzard.

In addition, according to the science and technology innovation board Daily, Blizzard also tried to return to Chinese mainland many times during this year, but it failed to negotiate with many manufacturers.

Blizzard undoubtedly regrets leaving the China market.

According to the data of Activision Blizzard’s 2023 financial report, the revenue of Blizzard Division in the first quarter was only $443 million, which was significantly lower than the $794 million in the previous quarter. At the same time, the number of active players in the world in the first quarter of 2023 was 27 million, compared with 45 million in the previous quarter. Although the latest revenue data of the second quarter of 2023 is very eye-catching, it is almost entirely due to the launch of Diablo IV.

Blizzard, which has left China, is facing difficulties and challenges.

It can be seen that although the players are eagerly looking forward to it, the agent Blizzard is still a hot potato for game manufacturers.

It is precisely because of this that after being reported by many media, the news that Netease and Blizzard had the experience and financial resources to join hands again made Dong Fangge look forward to it.

Of course, the premise is that both sides can pull their faces down.

Everyone remembers that after the storm in January, Netease removed the blizzard axe live on its official website and replaced it with its own horse-chopping knife, which attracted tens of thousands of people to watch. It also put a number of yin and yang drinks such as "Blizzard Green Tea" and "Blizzard Without Heart" on the coffee shop of Netease Building, and the connotation overflowed the screen.

However, Blizzard also gave "sincerity". On the 29th, the CEO of Activision Blizzard, who directly promoted the breakup of the two companies, officially resigned, which also made players more convinced that if Microsoft acquired Activision Blizzard wants to enter the game field, it must be laid out in the China market, and Netease is the best receiver.

"Blizzard, which once abandoned Netease, is like a love rat. Now we only feel that it is the turn of Blizzard to beg Netease to get back together!"

After a year

Players still miss the national costume.

Unlike Dong Fang, Li Ting couldn’t resist one’s fingers itch as early as the beginning of February 2023, that is, a week after Blizzard officially withdrew from China, and moved to Yafu with his friends.

As a veteran fan of Warcraft for 14 years, Li Ting’s hobby of playing Warcraft has continued from high school to this day, and he has spent tens of thousands of yuan on this game. Because he loves it enough, even if he moves to Yafu itself, he needs to read a lot of tutorials, and he has to spend an extra hundred yuan for the accelerator every month. He needs to start from scratch to create a new account in Yafu, and he is also happy.

"To put it bluntly, anyone who plays blizzard games doesn’t pay for youth."

However, in his view, Asian clothing can never be compared with national clothing.

"Take the simplest example. If you want to find manual customer service, you will only find AI robots. People who are doing customer service in Asian clothing are all beautiful people, but there is a time difference with you." Li Wei said. He also gave an example to AI Blue Media Exchange. For example, in Yafu, there are many players advertising in the main city. If the brush is too frequent, it will be judged by the system to be a plug-in behavior and other outrageous operations frequently appear, which greatly affects the game experience.

Even so, there are still a large number of "game refugees" flooding into Yafu. Li Ting also set up a special WeChat group, which attracted more than 300 players from the national service to the Asian service. As in the national service, a group of people went black every day. Many of them opened accounts in Yafu a few years ago, and the opportunity at that time was the breakup between Blizzard and the former agent Ninetowns.

In addition to Warcraft, Li Ting also tried to move to the Asian clothing of the games such as Watching the Pioneer and Hearthstone and start from scratch, but due to problems such as time and atmosphere, he finally failed to persist.

But in any case, there is no doubt that it is expected that Blizzard will return.

In fact, this time, well-informed players know that Netease Blizzard will be reunited for several days earlier than the outside world.

"Netease Thunder Fire Studio, which developed Diablo: Immortality, recently resumed recruitment. The position is MMO game user operation-loss recall data analysis post, which is located in Guangzhou. It is hard not to think that it is related to the restart of Blizzard games." Dong Fang said.

At the same time, the players also pulled out. Just a few days ago, Netease withdrew five of the six complaints against Blizzard. Netease Great God APP also updated the content of the existing version of World of Warcraft and built a new version of the chat room. The latest news shows that the IP address of "Blizzard Game Service Center" in WeChat official account is displayed in Guangdong …

In the player community of Netease Great God APP, players have created a jubilant atmosphere. In the investigation, a player told AI Blue Media that he sold the account of Yafu the first time after hearing the news and earned hundreds of dollars. "I didn’t want to play Asian clothes. After two days, the Asian clothes will return, and the Asian clothes account will be worthless. Take it early." He said.

During this period, Netease and Blizzard did not refute this rumor, which became one of the most important reasons for players to have illusions.

All this fine evidence seems to point to the fact that Netease and Blizzard are going to get back together.

If you take over blizzard,

Netease also has a plan.

However, the player’s expectation is not the only lubricant that turns into the reunion of the two sides’ capital.

In the past year, blizzard can be said to have ups and downs.

First, it was disclosed in Q1 financial report that the number of active users in the world dropped from 45 million to 27 million, and the revenue directly dropped from 794 million dollars in the previous quarter to 443 million dollars, both of which were almost halved. Later, in Q2, the net revenue of Diablo IV released in the current quarter exceeded $1 billion, achieving a breakthrough.

On the one hand, the fluctuation of these data is not unrelated to the decline in the revision quality of classic games such as Watching Pioneer, Storm Hero and Call of Duty. On the other hand, the loss of China market has also become the direct reason for the data shock in all aspects.

According to the financial report, after withdrawing from the China market in January 2023, the revenue of Activision Blizzard in Asia in this quarter was 306 million yuan, which was 24.5% lower than that in the fourth quarter of 2022, which was 381 million dollars.

According to media reports, in 2022, Activision Blizzard generated a total revenue of 480 million US dollars in China, and Blizzard shared a profit of 264 million US dollars, and the remaining 216 million US dollars went to Netease.

The China market is fertile enough, as Blizzard naturally understands.

The reason why Diablo 4 can bring extremely high revenue figures to Blizzard is bound to be related to this IP being refurbished again after 11 years, and whether it can have such a high heat as the heat drops is still unknown.

According to multi-dimensional data, Blizzard wants to return to China and needs to return to China.

In the Blizzard 2023 Carnival in November 2023, Blizzard President Mike ibarra once again raised the issue of the return of the national costume: "There are millions of players in China who love Blizzard games, and everyone in Blizzard wants to make sure that they can play our games."

The attitude is very clear, only the other party who is willing to lend a helping hand.

In fact, after careful study, it is not difficult to find that among many China game manufacturers, Netease’s takeover is a more cost-effective choice for both parties. On the one hand, Netease’s servers and player data are readily available. On the other hand, there are not many China manufacturers who are willing to pick up PC games again in the mobile game era. Netease is one of them.

Compared with Blizzard, Netease had a fairly comfortable year.

Netease once said in the financial report of the third quarter of 2022 that the expiration of the authorization with Blizzard will not have a significant impact on Netease’s financial performance. The revenue from games and related value-added services in the quarter was 18.7 billion yuan. In the fourth quarter, the data was 19.1 billion yuan, and it also reached 20.1 billion yuan in the first quarter of 2023, and the data increased steadily.

Obviously, the shock brought by Blizzard’s withdrawal to Netease is not obvious, and Netease has also found "Egg Party" as a new growth point.

Snowball shows that Netease’s share price has risen significantly in the past year.

Until a few days ago, the draft of the new rules of the game was launched. According to the new regulations, daily check-in and initial benefits will no longer be allowed, which caused Netease’s share price to drop from HK$ 159.8 to HK$ 122.6, with obvious shocks. After Netease’s scandal with Blizzard, the share price has a tendency to rebound.

This means that the capital market is looking forward to the two holding hands again.

On the other hand, as we all know, Blizzard games can gain many loyal fans around the world, and its irreplaceability is the most important reason. Recently, Tallis World, which was launched by Tencent in January, 2023, is in a frenzied business, and some players began to regard it as a meal replacement for World of Warcraft. Similarly, it began to be regarded as The Battle of the Golden Shovel as a meal replacement for Hearthstone.

This is undoubtedly a situation that Netease does not want to see.

It is precisely because of this that Netease’s disclosure of this news is extremely ambiguous, and it does not admit or deny it, giving the capital market and the majority of players unlimited reverie.

Once the real news is true, both Netease and Blizzard will be profitable, and the ceremonial AFK in January will only be gradually forgotten over time.

However, all this has not been confirmed.

What is waiting for the player is the popular hope, or another "wolf coming", but also wait for the answer given by time.

(Li Ting and Dong Fang are pseudonyms in the text)

Lanmeih/ Today’s Topic

Do you think Netease and Blizzard will get back together?

Let’s talk in the comment area ~

Original title: "Ten years of Warcraft players shouted: It’s Blizzard’s turn to kneel down and ask Netease to get back together! 》

Read the original text

Sulige Gas-fired Power Generation in Inner Mongolia: Firm Green Development and Serving Peak Regulation of Power Grid

Shoulder social responsibility and revitalize state-owned assets

Firmly develop green and serve the peak shaving of power grid.

—— Inner Mongolia Sulige Gas Power Generation Co., Ltd.

  Inner Mongolia Sulige Gas Power Generation Co., Ltd. isInner Mongolia Autonomous RegionBlock 1adoptGas generating unitdynamoelectricClean energy power plant,It’s from Mengxi Power Grid.heavyTo peak-load the power supply,canEffectively enhancing the peak-shaving ability of Mengxi power grid will play an important role in optimizing the power grid structure and ensuring the safe operation of the power grid.wearImportant role.After the power plant was completed and put into operation, the company suffered losses due to the increase in natural gas prices.Normal production stopped in October 2009 until June 2021.In 2021, the company tookParty history study and education as an opportunity, with the three-year action plan of state-owned enterprise reform as the starting point, scientific planning,plan as a wholeoverall arrangement, take the initiative to seek the autonomous region government.And the Development and Reform Commission, the Ministry of Industry and Information Technology, etc.department concernedInner Mongolia electric power companySupport and help, coordinate the promotion of capacity electricity subsidies.get permissionLanding,Through continuous overtime and hard work,effectiveRevitalize the idle for a long time.The 12-year-old state-owned assets have successfully resumed the peak-shaving operation of the units, effectively alleviating the power shortage situation in Mengxi power grid.

  Go forward in hard work.

  2021 is a crucial year for the three-year reform of state-owned enterprises and a crucial year for connecting the preceding with the following.,Repeated outbreaks at critical moments have affected the pace of unit technical renovation, maintenance and debugging to a certain extent. Leading Group of Sulige Power Generation CompanyIn order to insist that Qingshan does not relax his work style,checkFind and solve all constraintsreformdevelopAnd management.Obstacles,Under the premise of preventing and controlling the epidemic and ensuring safety and stability, withCapacity electricity subsidyget permissionfall to the ground,The technical renovation and maintenance of the unit has also begun. companyIn the group companyUnder the guidance of "Leading Group for Peak Regulation Operation of Restoring Units in Sulige Power Plant" and related working groups and expert groups, according to the maintenance and operation of two sets of units over the years, and according to the relevant regulations and specifications, the opinions of original equipment manufacturers and experts from Inner Mongolia Electric Power Research Institute, after repeated investigation and demonstration, 105 maintenance contents in seven categories, including gas turbine, waste heat boiler, electricity, thermal engineering, chemistry and voltage regulating station, were finally determined. power plantstop productionDuring the past 12 years, some original equipment manufacturers have already gone bankrupt or transformed. The company searched for similar equipment manufacturers at home and abroad, and raced against time to complete the procurement of equipment, materials and spare parts in accordance with the law.The service has many difficulties and challenges, such as tight time, heavy tasks and high technical requirements.existGroup company systemWith planning, careful guidance, full participation and full supervision,Constantly strengthen communication and coordination with various construction units, supervision units, operation and maintenance units and commissioning units.FinallyOn June 26, 2021, the No.1 gas turbine was successfully connected to the grid for power generation; On September 23, the second combined cycle was connected to the grid for power generation. The restart of the unit will play a positive role in serving the new power system with new energy as the main body and promoting the development of low-carbon life.

  Refine strength in epidemic prevention and control

  Under the epidemic situation, the maintenance personnel came from all over the country, which brought a lot of challenges to the epidemic prevention and control work. In order to ensure the epidemic prevention and control in the process of technical renovation and maintenance, the company formulated the Work Plan for Prevention and Control of novel coronavirus, and paid special attention to the implementation of responsibility classification, stratification and zoning. From monitoring the health status of participants, nucleic acid detection and safety protection, to screening for posts, code scanning and temperature measurement, we should strengthen supervision and guidance on the health and epidemic prevention work of outsourcing teams and outsourced personnel in technical renovation and maintenance projects, optimize working procedures and processes, reasonably arrange the construction period, minimize cross-work and personnel contact, and minimize the risk of personnel gathering. In the later period, due to the epidemic situation, the inspectors of Nanjing Nangang Power Equipment Installation Co., Ltd. could not arrive at their posts as scheduled, and the company repeatedly communicated with the relevant departments of the local government to solve the problem of personnel control and timely arrival. After the maintenance project management personnel arrive at their posts, the company regularly goes to the site to check the implementation of epidemic prevention measures, so as to ensure timely monitoring, clear division of labor and prevention in place. Through the overtime and hard work of all departments, the epidemic prevention and maintenance period was finally realizedThe goal of "zero infection and zero accident" ensures the smooth progress of various maintenance tasks.

  Improving quality and increasing efficiency in safety prevention and control

  The company always insistsGuiding Thought of "Safety First, Prevention First"Think,Adhere to the goal of safe production, comprehensively strengthen risk management and control, enhance risk prevention awareness, implement the responsibility system for safe production at all levels, compact the main responsibility, and carry out the requirements for safe production throughout.Organized a period of100UranianMaintenance safety guaranteeGeneral assembly war,Actively respond to maintenance tasks,Pay close attention to reducing costs, improving quality and increasing efficiency, and provide a strong guarantee for the company’s safe production.This overhaulFaceFour cooperative units and a working team of more than 260 peopleAt the same time, a number of technological transformations, large and small, are being carried out, and there are many cross-operations.Aerial work, live working and limited space work are difficult and demanding.,It has brought great challenges to the company’s safety work. In order to ensure the safety of technical renovation and maintenance of units, rules and regulations and emergency plans have been formulated in a targeted manner, emergency drills have been strengthened, and management of operating procedures has been strictly enforced.companyJoint supervision unit, adhere to24-hour on-site supervision has successively carried out special safety inspections such as epidemic prevention and control, traffic safety, on-site safety and civilized construction, fire prevention and flood control, and natural gas pipeline system, and carried out major safety inspections on holidays such as Qingming, Dragon Boat Festival, May Day, Mid-Autumn Festival and National Day and important power conservation periods.insist on"When the day is over, the day is over",insist onFight the epidemic situation, ensure production, strengthen control and protection.,realizewatch from a height or distanceGrasp with both hands, with both handshardTwo mistakes and two promotion.Through comprehensive measures, the foundation of safety management has been consolidated and the overall situation of safety and stability has been maintained.,No safety accidents occurred..

  Take the lead courageously in party building

  The flag was inserted in a line, and party member rushed forward.In 2021, the General Party Branch of Sulige Power Generation Company further strengthened "four consciousnesses", strengthened "four self-confidences" and achieved "two maintenance", and constantly improved political judgment, political understanding and political execution.Seriously study and implementpartyCentral and autonomous regionsParty Committee and SASAC Party CommitteeHe group companyParty committeeAll decision-making arrangements are closely aroundGeneral tone of "striving for progress while maintaining stability",insist on"Strengthen the party’s leadership andPerfecting corporate governance and unifying.""Deep integration of Party building work and production and management",Focus on strengthening party building work.Give full play to the general party branch of Sulige Power Generation CompanyThe role of "taking the direction, managing the overall situation and ensuring implementation", all party member "bright posts, bright commitments and bright performance", take the initiative.Bear a heavy burdenTask, accept supervision, service overhaul, inspire party member to play a vanguard and exemplary role.

  Make full push inThe study and education of the company’s party history has gone deep and practical, achieving momentum, distinguishing features and remarkable results. The general party branch accurately grasps the goal and direction of the study and education of party history, and studies and educates the central group study, theme party days, reading classes, special party classes, publicity and lectures, and special training.The "prescribed actions" are broken down and implemented on a monthly basis to ensure that there are activities every month, pushes every day, and echoes every time. Joint cooperation units carry out joint theme Party Day activities to learn the history of the Party, share the experience of maintenance, effectively combine the study of Party history, sum up experience, and compare with the actual technical renovation and maintenance work of the unit, and help the company’s reform, development and management with tangible learning results, forming a work cycle of "learning and education-promoting work-improving quality and efficiency". Adhere to activities such as "learning the history of the party every day", "singing red songs every day", "telling stories every week", "listening to lectures at the right time" and "doing tests on time"; Evening classes are held to learn the history of the Party, and five topics are divided to carry out centralized study, comprehensive study, systematic study, through study and online study, so as to promote the formation of a situation in which leaders take the lead in giving lectures, party member consciously leads the study, and all members interact to promote learning. Encourage all party branches and departments to inspire creative tension, actively introduce distinctive optional movements on the basis of perfecting the prescribed movements, make good use of the rich red resources and party history materials, enlarge the characteristics, create highlights, and carry out the study of party history with the theme of "remembering revolutionary martyrs and carrying forward the national spirit"Theme Party Day activities, held calligraphy collection, essay writing, knowledge contest, warning education,The study and education of party history is colorful in activities such as "always forge ahead with the party on a new journey" and staff cultural performances.

  Looking back on the party’s century-long history, it is an endless force of faith. The general party branch of Sulige Power Generation Company draws strength from the education of party history,Try to putI do practical things for the masses."Practice activities have been carried out in the hearts of the workers and staff. The general party branch of the company has repeatedly learned about the urgent needs and expectations of the masses from different channels, closely focused on the outstanding demands of the masses, and done practical things and solved problems for the masses in a down-to-earth manner, and finally determined the company’s" I do practical things for the masses "project list. Whether it is a major event of the company’s reform and development or a trivial matter of the staff dining table, the general party branch "treats people equally", formulates practical plans for people’s livelihood, clarifies node objectives, reveals the list and takes the lead, and makes every effort to push forward, earnestly doing practical things, doing good things well, and handling difficult things well, taking the voice of the masses as the basis for seeking things, and taking the word-of-mouth of the masses as the yardstick for judging, so as to turn the achievements of the study and education of party history into an inexhaustible motive force for doing our job well and promoting the development of the cause.

  A new journey has begun, and a new era is promising. General Party Branch of Sulige Power Generation CompanyIt has consolidated the overall situation of security and stability, maintained a positive trend and planted the advantages of green development.In 2021,The company has made new achievements in reform and development, made new breakthroughs in production and operation, made new improvements in enterprise management, and made new achievements in party building.In the future,SuligePower generation companyWill actively participate in the autonomous regionpeak carbon emissionscarbon neutralityWork, give full play to the gas unit inThe unique role of "double control" is to help with the tenacity of courageously taking the lead, the enterprising spirit of facing difficulties and the tireless efforts.companyRide the wind and waves in improving quality and efficiency, and fully serve the economy and society of the autonomous regionDevelop the overall situation,Playing the strugglers of the new era"The strongest sound.”。

Editor in charge: Zhou Xiaobo’s submission email:Online submission

Some opinions of Hunan Provincial Department of Transportation on further standardizing the management of expressway and provincial highway construction projects in our province

 

 

 

 

 

 

Xiang jiao Ji Jian [2018] No.116

 

 

Hunan Provincial Department of Transportation

Some opinions on further standardizing the management of expressway and provincial highway engineering construction projects in our province

In order to further strengthen the management of highway construction projects in our province, clarify the responsibilities of all parties, standardize working procedures, and promote the healthy and orderly development of highway construction, combined with the actual reform of highway construction management system in our province, according to the relevant laws, regulations and provisions of the state, Ministry and province, the following opinions are put forward.

One,Highway engineering construction implements the system of industry supervision and graded responsibility.

(a) the Provincial Department of Transportation is responsible for the industry supervision of highway engineering construction in the province. Specifically responsible for the supervision and management of expressway construction projects approved or approved by the national and provincial development and reform commission.

(two) the provincial highway management agencies entrusted by the Provincial Department of Transportation, responsible for the province’s highway engineering construction industry management.

(III) The Municipal Transportation Bureau is specifically responsible for the supervision and management of the common national and provincial highway construction projects included in the provincial transportation development plan within its administrative area. Other ordinary highway construction projects included in the provincial transportation development plan can be implemented with reference to this opinion.

Two, strictly implement the basic construction procedures, and effectively prevent management risks.

(4) Highway engineering construction projects must strictly implement the legal person responsibility system, the bidding system, the project supervision system and the contract management system, strictly implement the capital construction procedures stipulated by the state, and shall not violate or simplify the capital construction procedures without authorization. Transportation administrative departments at all levels should strictly examine and implement according to the management authority, and establish a sound management system and files.

(5) The provincial department of transportation is responsible for the examination and approval of construction drawings of expressway construction projects, and the relevant municipal and state transportation bureaus are responsible for the examination and approval of construction drawings of ordinary national and provincial highways.

Expressway construction projects shall be reported to the ministries and agencies by the project legal person after the organization completes the construction drawing design documents. The ministries and agencies entrusted the provincial highway management agencies to organize a review and consultation unit on behalf of the office for review., prepare the review report and put forward the industry review opinions (if the design and construction general contracting mode is adopted, the preliminary design unit shall also submit the design consultation and supervision report). For projects with complex technology, the ministries and agencies can entrust independent consulting agencies to check the construction drawing review, key parts and important structures, and the ministries and agencies will examine and approve the construction drawing budget according to the review report, verification opinions (if any), industry review opinions and the review opinions of the department’s cost management agency (except for the design and construction general contracting mode), and gradually establish and improve the construction drawing review and evaluation mechanism.

General national and provincial highway construction projects shall be reported to the relevant municipal and state transportation bureaus after the construction drawing and design documents are completed by the project legal person organization, and shall be reviewed by the municipal and state transportation bureaus and approved. The specific implementation rules shall be formulated separately by the municipalities. After the approval of the construction drawing is completed by the Municipal Transportation BureauWithin 15 working days, the construction drawing approval document shall be submitted to the provincial highway management organization for the record.

(six) highway engineering construction projects should establish and improve the quality and safety assurance system. Before the project starts, the construction unit shall go through the quality supervision procedures with the traffic quality and safety supervision institution as required. Expressway construction projects shall be submitted by the project legal person to the provincial traffic quality and safety supervision institutions, and ordinary national and provincial highway construction projects shall be submitted by the project legal person to the municipal and state traffic quality and safety supervision institutions. Traffic quality and safety supervision institutions at all levels shall promptly urge the construction unit to go through the quality supervision procedures in accordance with the regulations, and carry out quality supervision and management in a timely manner according to law.

(seven) highway construction projects shall implement the construction permit system according to law, and the project legal person shall strictly follow the "Measures for the Administration of Highway Construction Market" (ministerial order)No.11, 2015) stipulates that the construction permit procedures shall be handled, and the construction of the project without permission shall not be started. In case of violation, administrative punishment shall be imposed according to law.

For expressway construction projects, the project legal person shall apply to the Provincial Department of Transportation for construction permit, and for ordinary national and provincial highway construction projects, the project legal person shall apply to the relevant municipal and state transportation bureaus for construction permit. The transportation administrative departments at all levels shall make a decision on the construction permit according to the procedure, in which the ordinary national and provincial highway construction projects shall, after making the construction permit,Within 15 working days, the municipal and state transportation bureaus shall report to the provincial highway management agencies for the record.

(eight) highway engineering construction projects should be organized in stages according to the Ministry of Transport’s "Measures for Acceptance of Highway Engineering Completion (Delivery)" and related implementation rules.

The project legal person is responsible for the completion acceptance. After the completion of acceptance, the project legal person shall complete the project completion acceptance report in time as required, and report to the transportation administrative department that approved the project construction drawing design for the record. The completion acceptance of ordinary national and provincial highways shall be summarized by the municipal and state transportation bureaus at the end of each quarter and submitted to the provincial highway management agencies for the record. No traffic trial operation may be opened for projects that have not been completed or failed to pass the completion acceptance.  

After the project meets the completion acceptance conditions, the project legal person shall apply to the administrative department of transportation for completion acceptance. The completion and acceptance of expressways is organized by the Provincial Department of Transportation, and the completion and acceptance of ordinary national and provincial highways is organized by the local municipal and state transportation bureaus. After the completion and acceptance of ordinary national and provincial highways, the municipal and state transportation bureaus shallWithin 15 working days, the completion acceptance appraisal book will be submitted to the provincial highway management organization for the record.

Construction mileage is less than5 kilometers or a total investment of less than 50 million yuan of ordinary national and provincial highway construction projects (except bridges, long tunnels and above), can be completed and accepted by the municipal transportation bureau.

Three, strengthen the supervision of bidding process, and create a unified, open, competitive and orderly market environment.

(9) The project legal person shall follow the principles of openness, fairness, impartiality, honesty and credibility, implement the relevant laws, regulations and provisions of the state, the Ministry and the province, organize the bidding work of the project according to the approved bidding scope, bidding method and organizational form, and shall not evade bidding, discriminate against potential bidders and bidders, or implement local protection and black-box operation.

(ten) strictly implement the bidding filing management system. Expressway construction projects shall be submitted by the project legal person to the Provincial Department of Transportation for the record in a timely manner, including the qualification documents and results (if any), as well as the bidding documents and the written report on bidding (including the bid evaluation report). Ordinary national and provincial highway construction projects shall be reported by the project legal person to the relevant municipal and state transportation bureaus for the record in a timely manner, including the qualification documents and results (if any), as well as the bidding documents and written reports on bidding (including bid evaluation reports). If there are other provisions governing counties directly under the province, those provisions shall prevail.

(11) Highway construction projects shall fully implement the trading system of entering the public resource trading market, expressway construction projects shall enter the provincial public resource trading center for trading, and ordinary national and provincial highway construction projects shall enter the municipal and above public resource trading centers for trading.

(twelve) the construction projects of expressways and ordinary national and provincial highways should gradually realize electronic bidding. If electronic bidding is adopted, it shall be implemented in accordance with this opinion and the relevant provisions on electronic bidding.

(thirteen) the administrative departments of transportation at all levels shall supervise the bidding process according to the management authority, and deal with the complaints and reports in the bidding in a timely manner, and seriously deal with the illegal acts of bidding according to the law and regulations.

Four, standardize the management of engineering change, the implementation of hierarchical responsibility, prohibit unauthorized changes.

(fourteen) after the approval of the construction drawing design documents of highway engineering construction projects, they shall not be modified or changed without authorization. If it is really necessary to change the approved construction drawing design documents, it shall be implemented only after approval in accordance with the examination and approval authority. The Provincial Department of Transportation will strengthen the supervision and inspection of lowering construction standards and reducing construction scale changes.

(fifteen) highway engineering design changes are divided into two categories: highway construction projects and ordinary national and provincial highway construction projects.

1 need to improve technical standards or increase the scale of construction, and the increased investment exceeds the corresponding budget by 10% or more, and the design changes shall be reported to the original budget approval department for approval.

2. The Ministry of Transport approved the preliminary design of the expressway project, and its major design changes were reported to the Ministry of Transport for approval after the preliminary examination by the Provincial Department of Transportation.

The preliminary design of the expressway project approved by the Ministry of Transport has major design changes under one of the following circumstances; Or the provincial department of transportation approved the preliminary design of the expressway project, there is one of the following major or major design changes, submitted to the provincial department of transportation for approval:

① The starting and ending points of the route have changed;

(2) the route plan for more than 2 kilometers is adjusted continuously;

(3) the number of bridges or the structural forms of bridges and above have changed;

(4) the number of tunnels or ventilation scheme changes;

⑤ The number, location or scheme of interchange has changed;

6. The charging method, site location and scale have changed;

⑦ The standard and scale of the connecting line have changed;

(8) The type, width and thickness of pavement structure change;

Pet-name ruby management, maintenance and service facilities change in location, quantity and scale.

The remaining major design changes are entrusted to the project legal person for self-examination and approval. After the approval is completed,Report to the Provincial Department of Transportation for the record within 15 working days. General design changes shall be reviewed and approved by the project legal person.

3. The design changes of ordinary national and provincial highway construction projects (including technically complex projects) shall be formulated by the municipal transportation bureaus themselves, and the construction scale and technical standards shall not be arbitrarily reduced. It is a major design change, such as the change of the starting and ending points of the route, the adjustment of the route scheme for more than 1 km in a row, the change of the width of subgrade and pavement, the change of the overall pavement structure type, the change of the structure type and scale of the extra-large bridge, and the increase or decrease of the number of bridges and tunnels above the bridge. Within 15 working days after the completion of the approval, the municipal transportation bureau shall report to the provincial highway management organization for the record.

(16) Transportation administrative departments at all levels should strengthen the supervision and management of engineering design changes, and seriously investigate and deal with unauthorized changes, illegal changes, dismembered changes to avoid approval and other irregularities.

(seventeen) the project legal person should strengthen the project cost management and strictly control the project investment. In the process of project implementation, the budget estimate should be strictly taken as the highest control amount of project investment. If it is really necessary to exceed the budgetary estimate, the budgetary estimate shall be examined and approved in strict accordance with the relevant provisions. Transportation administrative departments at all levels shall strengthen the supervision and inspection of highway engineering cost activities in accordance with their duties and powers.

Five, strict market access, strengthen contract management, strengthen industry supervision, to ensure the quality and safety of the project.

(eighteen) highway and ordinary national and provincial highway construction projects shall implement the project legal person responsibility system according to law. The project legal person can manage the project by itself, or entrust a qualified management unit to manage it.

The technical and management capabilities of the legal person of the expressway construction project or the organization and personnel of the management unit entrusted by it shall conform to the Opinions of the Ministry of Transport on Further Strengthening the Management of the Highway Project Construction Unit.No.438 [2011]).

The legal person of provincial highway construction project or its entrusted management unit, organization and personnel shall meet the following basic conditions:

1. The organization has major functional management departments such as planning, contract, engineering, finance, quality and safety, with clear division of responsibilities and perfect management system;

2. The person in charge of the project is familiar with the national laws and regulations on engineering construction, with good political quality, high professional level, good reputation in the industry, more than 3 years of engineering management experience, and has served as the person in charge of one or more highway projects or the deputy person in charge of two or more projects, and should have intermediate or above titles;

3. The technical person in charge of the first-class highway and the construction project containing tunnels and extra-large bridges has the title of senior or above in highway engineering, has rich engineering experience, and has served as the technical person in charge of two or more highway engineering projects; The technical person in charge of highway construction projects of Grade II and below has the title of intermediate or above in highway engineering, has rich engineering experience, and has served as the technical person in charge of one or more highway projects or the technical personnel of two or more projects;

4. The first-class highway construction projects should have more than 5 engineers and technicians with intermediate titles or above in highway engineering, and the second-class highway construction projects should have more than 3 engineers and technicians with intermediate titles or above in highway engineering. Financial personnel should have the ability of financial accounting.         

When the preliminary design documents of the project are submitted for approval (including the first-stage construction drawing design documents), the highway project construction unit shall report the management institutions, management personnel and qualifications stationed at the project site to the relevant transportation administrative departments for verification. The competent department of transportation shall timely review, and those who fail to meet the qualification standards shall be instructed to supplement and improve, or instructed to entrust a construction agent with corresponding management capabilities to be responsible for construction management. In the process of project construction, the change of main personnel such as the project leader or technical leader shall be reported to the relevant transportation administrative department for verification.

(19) highway design, construction, supervision, testing, consulting and other business units shall have corresponding qualifications, fully perform their obligations in accordance with the provisions of the contract, and prohibit acts such as relying on lending qualifications, subcontracting and illegal subcontracting.

(twenty) the project legal person should strengthen the management of contract performance, include the breach of contract and the liability clauses in the bidding documents or contract documents, and establish and improve the penalty and assessment incentive mechanism for breach of contract.

(21) The project legal person shall formulate and improve the management system of project quality, safety, progress and cost, effectively improve the management ability and quality, establish and improve the project quality and safety assurance system, implement the project quality responsibility registration system and lifelong responsibility system, vigorously promote the standardization construction, further strengthen the project quality and safety management, and ensure the inherent quality and durability of the project, and ensure the quality and safety of the project.

(twenty-two) transportation administrative departments at all levels should strengthen information management, and gradually establish an information management platform for highway construction. Make full use of information means such as big data and cloud platform, implement dynamic management of information such as performance of highway construction project personnel, and effectively improve the supervision ability and level of the industry.

(23) Provincial highway management agencies should earnestly fulfill the management responsibilities of highway engineering construction industry in the province, and focus on strengthening the guidance and supervision of the approval of construction drawings, construction permits, construction management, design changes, and completion (handover) acceptance of provincial highway construction projects.

(24) transportation administrative departments at all levels and industry management institutions should strengthen industry supervision, and organize comprehensive supervision and special supervision of highway construction markets and construction projects within their jurisdiction according to management authority, and all inspection results should be included in market credit records, annual transportation target assessment and quality work assessment. The illegal acts found by the inspection shall be punished according to the management authority.

(25) The Municipal Transportation Bureau is responsible for the supervision and management of national and provincial highway construction, adoption and transfer of ordinary highways, and shall, in accordance with the construction, management and transfer plan approved by the local people’s government and relevant regulations, promptly clarify or adjust the custody responsibilities of relevant units during the project construction period and the adoption institutions after the completion, and strengthen the supervision and management of project adoption and transfer.

VI. Others

(26) departments at all levels should earnestly strengthen the building of a clean government, improve the working mechanism, strengthen the management of projects and personnel, plug management loopholes from the system and mechanism, establish and improve a long-term mechanism for preventing and punishing corruption, build sunshine transportation, and enhance the image of the industry.

(27)This opinion is fromIt will come into force on August 1, 2018 and will be valid for 5 years.

 

 

 

Hunan Provincial Department of Transportation    

July 12, 2018

Hunan Provincial Department of Communications Office                Printed on July 27th, 2018

Shanxi: United as one, we will survive the difficult times and go all out to restore our beautiful homeland.

  During the National Day holiday, a heavy rainfall that lasted for more than 90 hours pushed Shanxi to the forefront.

  The lower reaches of Fenhe River suffered the biggest flood peak in the past 40 years, with 37 rivers in Shanxi flooding, embankments such as Wuma River, Fenhe River and Ciyao River burst, 60,213.6 kilometers of roads were damaged, 1,757,100 people in 76 counties were affected, and 120,100 people were resettled urgently. The affected area of crops reached 3,576,900 mu, resulting in a direct economic loss of 5.029 billion yuan.

  Danger is constant, and responsibility is like a mountain! People first, life first!

  The Shanxi Provincial Party Committee and the provincial government responded quickly, started the disaster relief response at the first time, and allocated and allocated relief materials and funds in a timely manner. Party committees and governments at all levels, the people and the rescue team were moved by the "flood" and United as one, starting a "tough battle" for flood control and disaster relief, and restoring and rebuilding their homes.

  The cadres of Xixue Village, Jifeng Town, Jishan County and the rescue team worked together to fight floods. Photo courtesy of Yuncheng Daily

  Comprehensive response, life first, launching a "tough battle" for flood control and disaster relief.

  Shanxi, which has always been short of water, is now a Zeguo.

  "From October 2 to October 7, the average precipitation in the province was 119 mm, and the average rainfall in the Fenhe River Basin was 132.6 mm, both far exceeding the historical level. This is the strongest precipitation process in autumn since Shanxi has meteorological observation records. " Wang Wenyi, deputy director of Shanxi Meteorological Bureau, said.

  Flood is an order, and flood control is a responsibility.

  The Shanxi Provincial Party Committee and the provincial government attached great importance to it, and quickly convened the province’s flood control and disaster relief and post-disaster recovery and reconstruction work meeting, and made a special deployment meeting to restore production and living order after the disaster, and made arrangements for doing a good job in related work.

  The officers and men of the armed police are stepping up the construction of dams. Photo courtesy of Yuncheng Daily

  Although disasters are merciless, people can be more promising. Shanxi launched a provincial flood control level IV response and decisively shut down some coal mines, non-coal mines and hazardous enterprises; In view of Taiyuan, Lvliang, Jinzhong, Yuncheng and other places with serious dangers, 165 rescue teams and 13,535 people were mobilized to rescue and rescue; Set up 845 temporary centralized resettlement sites, distribute 4,520 tents and 24,600 cotton trousers, and properly resettle the affected people; The Shanxi Provincial Department of Finance, together with the Provincial Emergency Management Department, the Provincial Department of Agriculture and Rural Affairs, and the Provincial Department of Water Resources, issued 50 million yuan of provincial flood disaster relief funds, 148 million yuan from the Shanxi Charity Federation, and 80.2 million yuan from the social relief donations accepted by the Shanxi Red Cross. The National Disaster Reduction Committee and the Emergency Management Department also launched the national level IV emergency response to disaster relief, and sent disaster relief working groups to assist and guide the resettlement and relief work of the affected people. The Ministry of Finance and the Emergency Management Department urgently pre-allocated 50 million yuan of central natural disaster relief funds to Shanxi, and all the funds have been allocated to the grassroots of cities and counties.

  At the same time, more than 3,000 cadres and experts from the agricultural and rural system in Shanxi Province went to the fields for the first time to help the affected farmers solve practical difficulties and problems. Shanxi CDC quickly dispatched more than 50 professionals in emergency, infectious diseases, vectors, drinking water, food safety and disinfection to form 11 expert groups, and went to various cities to supervise and guide post-disaster epidemic prevention and risk assessment in the affected areas.

  United as one, we can overcome the difficulties together. Shanxi Province actively responded to the dangerous situation and spared no effort to rescue it. After continuous fighting, the province’s flood control and emergency rescue achieved initial results.

  Overcome difficulties and charge the front line, and strive to restore the order of production and life.

  From the early morning of October 3 to 17: 00 on October 6, the continuous rainfall in Qixian County of Jinzhong City reached 89 hours, and the rainfall in the whole county was nearly 200 mm. The average and maximum daily precipitation approached the historical peak.

  On October 6th, Changyuan River Bridge on Nantong-Pudong Railway was attacked by a flood, the abutment was washed away by the flood, and the rails and sleepers were suspended, just like an "iron cable bridge". Changyuan River is the mother river of Qixian County, with a total length of 75,000 meters in Qixian County. Changyuan Henan Tongpu Railway Bridge spans the east and west sides of Changyuan River, which is a railway trunk line running through south-central Shanxi.

  Race against the flood, race against time. After the dangerous situation occurred, China Railway Taiyuan Bureau Group Co., Ltd. and Jinzhong City and County fully organized emergency repairs and mobilized more than 800 construction workers to carry out emergency construction day and night. Blast the overflow bridge and open the 30-meter-long spillway; Interception of Changyuan River for 3 hours to gain time for railway construction; More than 200 transport vehicles, more than 50 loaders, excavators and other machinery have all been put into the rush work … … At 7: 36 on October 14th, the South Tongpu Railway resumed operation in both directions after being repaired day and night.

  South Tongpu Railway Repair Site. Photo courtesy of China Railway Taiyuan Bureau Group Co., Ltd.

  "Unity is strength, unity is strength, this strength is iron, this strength is steel … …” At 9 o’clock on the evening of October 7, at the bank of Ciyao in Xiangle Township, Pingyao County, bursts of songs pierced the night.

  Singing loudly, against the roar of the flood — — Ciyao River burst its banks, and the general attack of blocking is about to start. This song is the call sign for Pingyao Brigade, the fire rescue detachment of Jinzhong City, which has been fighting for more than ten hours continuously! Finally, at 1: 30 am on October 8, the Ciyao River burst and successfully closed! The fire commanders and fighters made great efforts to widen and reinforce the dam, and checked repeatedly to ensure that the hidden dangers were eliminated before leaving the scene.

  At this moment, the Ciyao River has returned to calm, leaving only a trail of fighting on the muddy embankment. In this battle, 52 officers and men of Pingyao Fire Fighting worked nonstop for 14 hours, built a dam for 16 meters, laid 182 wooden stakes and iron piles, struck about 4,800 times, and filled 9,600 bags of cement. According to statistics, from October 1st to October 7th, Shanxi Firefighters dispatched 386 flood-fighting rescues, 627 fire-fighting vehicles and 3,801 people, and evacuated and rescued 920 trapped people.

  Persistence, rescue and mutual assistance … … Numerous forces of "riding the wind and breaking the waves" emerged in the rainstorm. They put on "raincoats and shirts" and became the guardians of the city and the people.

  As of October 11th, 30 blocked sections have been blocked by highways in Shanxi Province, 19 blocked sections have been blocked by ordinary national and provincial trunk highways, and 2,800 blocked sections have been blocked by rural highways. The road transport network in the province has basically recovered smoothly. The 56 coal mines that stopped production have resumed production, which will not have a significant impact on Shanxi’s coal supply.

  Look out for each other, support from all directions, and go all out to restore a beautiful home.

  The rain is continuous, the river is rising, and the areas where Fenhe River and Qinhe River flow are the most seriously affected. The villages built by the river are facing a severe test.

  "I never thought there was such a big water." Li Xiaobin, secretary of the Party branch of Beiqiaotou Village, Daxiaobao Town, xiaoyi city, Shanxi Province, recalled the past few days and was very sad. Beiqiaotou Village is located in the south-central part of Shanxi, at the intersection of Wenyu River, Ciyao River and Fenhe River, and it is one of the villages most seriously affected by this flood. "The village was flooded by water more than one meter deep, and the deepest part was more than two meters. The water in the house flooded onto the kang and debris floated. "

  On October 3, Li Xiaobin found that the water level of Wenyu River was rising rapidly, and he felt that something was wrong. He and the cadres of villages and towns have successively found more than 10 loaders and 4 excavators to reinforce and raise the dams on the edge of the village with soil and sand.

  The plugging failed. On October 6, after learning that the upstream reservoir was going to flood, more than 2,000 people in Qiaotou Village were all transferred, and Li Xiaobin finally evacuated.

  At the same time, Hongshan Village, Jiexiu City, which is separated from Qiaotou Village by a river, is also facing collective transfer. The water level is getting higher and higher, so evacuation needs the help of transportation. Some villagers provide their own excavators, and many excavators transport people at the same time. Along the way, the village loudspeakers repeatedly sounded the village committee’s exhortation: "Do a good job of protection and evacuate quickly" and "Life is the most important" … …

  On October 8, at the resettlement site of Xinjiang Gymnasium in Yuncheng City, two medical staff on duty (left) learned about the physical health of the people affected by Hongfeng. Gao xinsheng photo

  In the face of great disaster, Shanxi people tried to save themselves. At the same time, familiar "life-saving documents" reappeared. The producer is Qi Yifei, a Shanxi girl who is a junior at Xi ‘an Jiaotong University. On the evening of October 6th, she posted her own online sharing form on social media for everyone to provide rescue and disaster information. In just 48 hours after the document was published, more than 600 pieces of help and rescue information were gathered.

  Along with the flood, there are also a large number of rescue teams, volunteers and a steady stream of relief supplies. The assistance from all directions illustrates the spirit of China, which is to help each other and help each other in the same boat.

  — — I am still in post-disaster reconstruction. I heard that Shanxi was hit by a devastating flood. Li Baomin, the affected people in Liulitang Village, Shangle Village, Weihui City, Henan Province, did not hesitate to donate more than 10 acres of 60,000 kilograms of cabbage and radish.

  — — By plane and high-speed train, An Bin, a young man from Urumqi, traveled more than 2,700 kilometers to Linfen, Shanxi, just to become a flood control volunteer.

  A special "concert" was held at the resettlement site of Xinjiang Gymnasium in Yuncheng City, where the logistical support was smooth. Volunteers sang My People,My Country with the masses and cheered each other.

  The owner of Yuncheng steamed bread shop made 1000 Chinese buns at 3 am and drove them to flood relief workers. Steaming food should be thrown away even through the flood.

  Hu Lei, who is disabled and lives by picking up garbage, donated a car full of materials to Beiqiaotou Village from Ningxia.

  … …

  Related topics such as "Refueling in Shanxi", "Summary of urgently needed materials in Shanxi" and "Holding an umbrella for Shanxi" have been hotly searched, and netizens have been constantly forwarding them, and the spirit of mutual assistance has been transmitted among networks, which has provided strong support for disaster prevention and relief work.

  The flood is too great to stop goodwill and determination. After the rainstorm washed away, it washed out the sparkling beauty of human nature.

  After the rainstorm, villagers in Rencun Township, Taigu District, Jinzhong City seized the opportunity to harvest peanuts. Sun Taiyan

  "I have the confidence to lead everyone to rebuild Beiqiaotou Village, and please rest assured the villagers. There is a strong motherland behind us. " Li Xiaobin bowed while wiping his tears, and the young and old beside him kept nodding. With the arrival of various professional rescue teams, the accumulated water in the affected villages in Daxiaobao Town, including Beiqiaotou Village, is declining.

  At 18: 00 on October 11th, 78 elderly people from the Recreation and Nursing Home in Lingshi County, Jinzhong City, Shanxi Province returned to their warm homes safely. "When the flood receded, we went home and were not afraid."

  Some people say, "the children of Sanjin survived the most difficult time." At present, the flood flow of rivers in Shanxi has been continuously reduced, and the river gaps have been blocked one after another. The disaster relief materials from all over the country have been fully put in the resettlement sites, and the disaster situation has been alleviated to some extent. Ensuring the basic livelihood of the affected people is placed at the top of the current relief work. As of October 12, Shanxi has implemented a total of 43,042 temporary relief for people suffering from disasters and distributed relief funds of 25.001 million yuan; Charity associations at all levels in the province have received a total of 214 million yuan of social donations and materials worth 76 million yuan, and urgently needed materials such as 148 million yuan of donations and 62 million yuan of warm clothes and quilts are being allocated to the disaster areas one after another.

  For the affected areas, the greater difficulty lies in the subsequent recovery and reconstruction. Intensify river clearing to ensure smooth flood discharge; Strengthen the prevention and response to geological disasters such as landslides and mudslides, and carry out inspections and dangers of warping dams and tailings ponds; Do a good job in the investigation of rural adobe houses, caves and other places, and strengthen the investigation of houses soaked in cities for a long time and shanty towns … … While doing a good job in flood control and disaster relief and helping the affected people, Shanxi has gone all out to rebuild its beautiful home.

  May Shanxi be safe, and Shanxi will eventually be safe. We believe that the land of Sanjin, which is outstanding in people and places, will be able to rejuvenate and reproduce good scenery.

Rural Community Life Circle Discussion | Please imagine the future "natural ecology" scene in rural Shanghai.

Facing the world and the future. In the future, Shanghai’s countryside will become an extremely precious scarce resource for megacities, an important bearing place for urban core functions, and a strategic space to enhance urban energy level and core competitiveness.

Shanghai Planning and Natural Resources Bureau will work with Shanghai Urban Planning and Design Institute to focus on future rural communities.Natural ecology, innovative production, neighborhood friendship, future entrepreneurship, headquarters service, artistic creation, tourism and leisure, and intelligent management.Eight scenes and a series of thematic discussions. The first seminar on "natural ecology" is about to start.

Do you still remember the questionnaire "Please conceive Shanghai rural community life circle" in January this year? In this consultation, we found that "natural ecology" is the most anticipated scene, and everyone also put forward many of their own visions.

On may 8,Shanghai Municipal Bureau of Planning and Natural Resources will "Natural and Ecological Rural Scenes" As the theme, from the cross-border perspective of various disciplines, experts from universities, professional organizations and other parties, as well as relevant government departments, are invited to discuss how to rely on the rural natural environment to realize functional activities such as popular science exhibition, nature education, ecological management, leisure and recreation. In this way, it provides ideas and reference for future rural development and renewal practice, and also serves as a reference for public opinions on the current planning guidelines and pilot compilation of rural community life circle in Shanghai.

Chen Xuechu: Take nature as a teacher and be friends with nature to build an urban ecological countryside.

Guo Taoran: Old Trees, Streams and Fields —— Local Impression of Rural Shanghai

Wei Min: The Landscape of Life

Zheng Guangqiang: Community Reconstruction and Activating the Countryside —— Practice of Community Life Circle Construction in Villages with Villages

Note: The theme and order of sharing by guests shall be subject to the arrangement on the day of the meeting.

Share guest introductions(in alphabetical order)

Chen xuechu

Professor, East China Normal University. Theoretical research and technical research and development are mainly carried out around the direction of ecological restoration of land space, control of harmful algae blooms and wetland restoration; At the same time, he is also engaged in ecological engineering design, paying attention to the composite utilization and quality improvement of urban and rural ecological space, protecting and exploring the service function of ecosystem, and providing natural-based solutions for green development. He has presided over ecological design projects such as parrot Island ecological wetland, Langxia country park, agriculture, forestry and water town, etc.

Chen xuechu

Guo Taoran

Founder of Urban Wilderness Studio, executive director of Shanghai Tianyuan Ecological Technology Co., Ltd., deputy director of Shanghai Nature Education Professional Committee, director of Shanghai Research and Practice Education Alliance, and director of East China Natural History Alliance. Engaged in the research of biodiversity restoration technology and nature education in East China, since designing and managing the first urban biodiversity restoration project in Shanghai-Yijiayuan Ecological Conservation Area in 2016, a total of five related projects have been built in Shanghai to promote the construction of urban ecological network.

Guo Taoran

Wei min

Co-founder of the Four-leaf Caotang, the general manager of the planning and design of the team. Doctor of Architecture, Tongji University, national first-class registered architect, certified teacher of Park Gate sustainable design. Interdisciplinary creation of localized and participatory ecological landscape aims at accelerating the restoration of urban habitats. Representative works include the landscape, architecture and interior design of Qianxiaoju Creative Farm, the landscape and sustainable design of Shanghai Chuangzhi Agricultural Garden, and the landscape, architecture, interior and logo design of Shanghai Zhuanghang Child-friendly Community Garden.

Wei min

Zheng Guangqiang

Co-founder of Xiangban Wenlv, Chairman of Xiangban Yuanshe, Dean of Xiangban Design Institute, Master of Tongji University. Adhering to the ideal of accompanying the city with the countryside, helping the rural revitalization and construction. The Redmi Plan to save Hani villages in Yuanyang, Yunnan Province was jointly launched, aiming at opening up the economic linkage between the local and the outside world with the "rice" as a breakthrough, and realizing the economic recovery and cultural recovery of ancient villages under the goal of protecting the world heritage.

Zheng Guangqiang

Recruits please join the ranks: a real and vivid "growth diary" of recruits

How does a recruit grow into a qualified soldier in 180 days and nights? "Recruits please join the ranks" goes deep into the record and observation of the recruit training base, and is serious and lively, showing the process of quenching the recruits into steel after 00.

Author: Zheng Changhua

How many steps does it take from ordinary people to soldiers? Establish rules, organize internal affairs, conduct actual combat training, and conduct rigorous assessment … Recently, the military documentary "Recruits Please Join the ranks" jointly produced by Tencent Video and CCTV was broadcast online, and the whole process of the recruits growing into qualified soldiers was recorded by lens.

 

The program consists of seven periods, each with a theme. Starting with "Why did I choose to be a soldier", it has gone through 180 days and nights, spanning 20,000 kilometers, and went deep into the recruit training base of the three armed forces, telling the stories of recruits and military camps with short stories and true details.

Youth stories of recruits after 00

The recruits come from all over the world, with different life experiences and different temperaments, but they all come to the same place-the military camp with their love for the motherland.

 

Xu Menghao, high flyers, Department of Philosophy, Peking University, likes reading and Henan Opera; Duan Runzhi, an undergraduate student, is lively and excellent in learning, and is what people call "the child of others"; Lin Junlong, born by the sea, used to be a chef in a five-star hotel; Cai Zhuoyu, a fine arts major, hopes to paint in the blue sky with fighter planes after entering the military camp … Such a group of young people constitute the epitome of the whole film’s recruit camp.

 

"Recruits please join the ranks" aims the camera at these recruits after 00 and records the process of their tempering into steel. This tempering process is naturally full of hardships and challenges.

 

"It’s too difficult to turn a quilt into a tofu block!" Duan Runzhi, an army female soldier, never thought that she would "cushion the bottom" in a late-night emergency pull. The instructor’s minimum requirements became her "ceiling". The first packing was completely out of specification, and the second packing was successful, but she was criticized by the instructor for being too slow.

 

The air force brigade will fuck, and Class 9 will win the championship in one fell swoop. The joy of "counterattack" didn’t last long, and the pull-up project suddenly turned Cai Zhuoyu and Lin Junlong back to the prototype of "rookie". Physical fitness test, their scores hit a new record low, waiting for them is the "devil" training customized by the squad leader for them.

 

"It’s very real" and "It’s so good to cry" … Since the broadcast of "Recruits Please Join the Team", it has gained a lot of attention among young audiences. The protagonists of these stories do not have their own aura, but ordinary young people. Putting them in a special living environment, their stories naturally collide with the audience.

 

The film focuses on interacting with young netizens and strengthening dialogue with the audience in a full-fledged presentation. On the one hand, it is a humorous panoramic record of the recruits’ state. The rotation is left and right, the singing of military songs is out of tune, and the squad leader directs his comrades to "hit the tree" … A series of "god operations" with their own jokes make the work more grounded; On the one hand, Wang Bingbing, a reporter from the General Station, is the narrator, and the relaxed and humorous comment language such as "Mother learns to bully", "paddling to fish", "being rubbed by reality" and "Voldemort" not only adds a sense of delicacy to the film, but also adds youthful expression.

The growth story from youth to soldiers

Director Zhao Yunze said: "Before officially contacting this project, it is hard to imagine how the army trained ordinary people into soldiers in batches in just six months."

 

The director’s curiosity is also the breakthrough of the film.

 

Before joining the army, the recruits’ imagination of the military camp was intense and grand; After joining the army, their reality in the new barracks is to stand at attention at ease and have a little routine. "Recruits Please Join the Rank" concentrates the six-month time that these recruits entered the military camp after 00 in chronological order, and records their growth stories in the "conflict" and dynamics.

 

The title of "Peking University" did not give Xu Menghao more superiority. He was appointed as the monitor of the new recruits, and one of his duties was to upload and issue. It seems simple, but it is challenging: this requires him to have both excellent basic skills and high emotional intelligence, otherwise it will be difficult to convince the public.

 

In the updated program, Xu Menghao hit a wall when he first exercised his monitor’s rights. "Everyone is a recruit. Why do you command everyone to work?" Some comrades-in-arms disagreed with the way he assigned work and complained. With the help of veterans, Xu Menghao gradually realized that there was a big problem in his way of doing things. In the latest "picnic", he took the initiative to integrate into group activities and finally realized the "breaking the ice" with his comrades.

 

The program focuses on the intuitive response of recruits to setbacks, and outlines a "deformation meter" belonging to recruits in the low valley-contradiction-growth. Under the lens of the program, every recruit’s body and soul are being "scattered" and "reshaped" again. In the process of recording, in addition to the principle of non-intervention, the program also used another method-giving the microphone to the recruits.

 

At the end of the first program, the recruits can finally contact their families. Some people burst into tears at the sound of their family members, some people cried because they missed their mother and asked her to take more photos and send them to them, and some people told their families to have a good meal … A homesick greeting instantly "returned" the recruits to their prototype. At this moment, homesickness spread among them, without concealment or restraint, and all feelings broke through the screen. Iron soldiers are accompanied by deep affection, and the program outlines the true appearance of teenagers in real records.

 

As a co-producer, Tencent Video continues to connect with the audience in a young voice and novel expression. From How to Talk about this painting to The Great Qin of the Fresh Museum, and this time, the new recruits are invited to join the ranks. The themes are different, but they are all constantly "new" in expression. This time, "Recruits please join the ranks" aims at the recruits, which is a new exploration of the young expression of military themes. In the follow-up program, what are the unknown training programs for the sailors of the "One Speciality and Many Capabilities" warship, how to train the female soldiers of the "Snow Lotus on the Plateau" garrison in Tibet, and how the airmen of the "Blue Angel" air force guard Hawk to complete the battle will all be shown one by one.

Editor | Sui Fangfang Ning Yahong

Promoting academic theory innovation should adhere to problem orientation

   [Reading Classics Theory]

   General Secretary of the Supreme Leader pointed out: "In the final analysis, accelerating the construction of philosophy and social sciences with China characteristics is to build China’s independent knowledge system. We should take China as a mirror, take the times as a mirror, base ourselves on the reality of China, solve the China issue, constantly promote the creative transformation and innovative development of Chinese excellent traditional culture, and constantly promote knowledge innovation, theoretical innovation and method innovation, so that philosophy and social sciences with China characteristics can truly stand in the world academic forest. " Problems are the starting point and power source of innovation. Marx pointed out: "The problem is the open and fearless voice of the times that influences all individuals. The problem is the slogan of the times and the most practical voice for it to express its mental state. " Marx and Engels’ practice of carrying out theoretical research based on the "question" as the "voice of the times" is of great enlightening significance for us to construct China’s independent knowledge system and promote academic theoretical innovation.

  one

   In 1843, when German philosophers were still immersed in criticizing the achievements of German religion, Marx was keenly aware that Germany’s "problems" had changed. Marx pointed out that as far as Germany is concerned, the criticism of religion has basically ended, and with the "sacred image of human self-alienation being exposed", how to "expose self-alienation with non-sacred image" has become the main "problem". Marx believes that based on this change of "problem", philosophers’ critical activities should also be changed accordingly, that is, "the criticism of heaven becomes the criticism of the world, the criticism of religion becomes the criticism of law, and the criticism of theology becomes the criticism of politics". In Marx’s view, this change is "an urgent task of philosophy serving history", so it is not dispensable and insignificant for philosophers. In other words, it has become "the voice of the times" to criticize the world and establish the truth of this world. This "voice of the times" became the fundamental guide for Marx to engage in theoretical research later.

   In carrying out "criticism of the world", Marx encountered another problem, that is, the relationship between "philosophy" and "changing the world". In terms of philosophy, Marx was deeply influenced by German philosophers represented by Powell and Feuerbach at first, but he soon realized that the different "explanations" of these "philosophers" about the world did not help the "change" of the world, which prompted him to start a comprehensive liquidation of his previous philosophical beliefs. As far as the philosophical nature is concerned, as Engels pointed out, "Strauss, Powell, Stiener and Feuerbach are all branches of Hegel’s philosophy as far as they have not left the land of philosophy." The transformation of Marx’s philosophy view is inseparable from the reflection and criticism of this kind of philosophy. Marx and Engels in the period of German Ideology have clearly realized that the core of young Hegel’s philosophy is to have a naive fantasy, that is, to think that "the real world is the product of the conceptual world", and then think that as long as people’s ideas are changed, the world can be changed accordingly. In Marx and Engels’ view, to correctly grasp the relationship between philosophy and changing the world, we must realize the transformation of historical view, from the idealistic historical view that emphasizes "looking for a certain category in each era" and "explaining practice from the perspective of ideas" to the materialistic historical view that emphasizes "always standing on the basis of realistic history" and "explaining the formation of ideas from the perspective of material practice". In this sense, the establishment of historical materialism is the result of theoretical activities based on problem orientation.

   The greatest achievements in philosophy and social sciences in the world are all created by answering and solving the major problems facing people and society. This is the case with Das Kapital. Engels pointed out that "the relationship between capital and labor is the axis around which all our modern social systems revolve". It can be said that how to grasp the "relationship between capital and labor" is a fundamental problem in the era when Marx and Engels lived. Grasping this problem well can not only understand the essence of capitalist society and see its development trend clearly, but also reveal the root of proletarian self-alienation and find a way to eliminate this self-alienation. In other words, if Marx wants to criticize the world and explore the truth of this world, he must grasp the problem of the relationship between capital and labor and resort to political economy. However, not only did this issue not enter Marx’s field of vision at first, but political economy was not Marx’s main attack direction at first. Marx recalled that although his major in college was law, his favorite subjects were philosophy and history. During his time as an editor of Rheinische Zeitung, he "first encountered the difficulty of expressing his opinions on the so-called material interests", which became the initial motivation for him to study economic issues. Later theoretical work made Marx come to the conclusion that both the study of the relationship between law and the anatomy of civil society should be sought in political economy. Through the study of political economy, Marx comprehensively understood and grasped the relationship between capital and labor, and obtained a series of important discoveries such as "surplus value".It can be said that it is precisely to grasp and explain this important issue that contributed to the creation of Das Kapital. Engels pointed out in the book review of Karl Marx’s Das Kapital Volume I-For Democracy Weekly that the greatness of Das Kapital lies in the fact that the relationship between capital and labor has been scientifically explained for the first time. It can be seen that the size of a theoretical achievement is closely related to whether it can reasonably answer the major issues of an era.

  two

   Report to the 20th CPC National Congress of the Party pointed out: "Problems are the voice of the times, and answering and guiding the solution of problems is the fundamental task of theory." We should grasp the pulse of the times, focus on major issues and guide them through the whole process of building China’s independent knowledge system and building philosophy and social sciences with China characteristics. To this end, we should pay attention to the following aspects:

   First of all, take what we are doing as the focus of academic theoretical research. General Secretary of the Supreme Leader pointed out that "China’s philosophy and social sciences should focus on what we are doing, dig up new materials, discover new problems, put forward new ideas and construct new theories from the practice of China’s reform and development". To construct philosophy and social science with China characteristics, we should base ourselves on the reality of China and take root in the land of China, and oppose the practice of carving a boat to seek a sword, imitating a cat and painting a tiger, copying mechanically and painting a gourd in the same way that is divorced from the reality of China.

   Secondly, be good at grasping and explaining those inevitable problems. In the practice of China’s reform and development, we will encounter many problems, some of which are accidental. Of course, these problems need to be studied and solved, but in contrast, we should pay more attention to those inevitable problems. Engels pointed out that "the attribute of reality only belongs to what is inevitable at the same time", that is, "inevitability" means "reality". In this sense, those inevitable problems should be the research objects of philosophy and social sciences because they have real reality. For example, the reason why the relationship between capital and labor is the problem to be studied in Das Kapital is that Marx saw that the opposition between labor and capital is an inevitable and realistic opposition. Marx pointed out: "As long as it is not understood as the opposition between labor and capital, the opposition between the proletariat and the productive is still an irrelevant opposition, an opposition that has not been understood from its dynamic relationship and its internal relationship, and has not been understood as a contradiction." That is to say, only when the "opposition between the proletariat and the productive" rises to the "opposition between labor and capital" will this opposition be inevitable and realistic, and it will become a problem that must be taken seriously and studied.

   Finally, focus on the overall, fundamental and key issues related to the development of the cause of the party and the state. As far as the practice of socialist modernization is concerned, because those inevitable and realistic problems are often global, fundamental and key issues related to the development of the cause of the party and the country, adhering to the problem-oriented requires us to focus on such major issues and show our true skills and achieve good results in the study of these major issues.

   (Author: Exhausted Changguang, a professor at the Marxist Department of Northeast Normal University, this article is the phased achievement of the key project of the National Social Science Fund "A Hundred Years’ Inheritance and Exploration of Marxist Dialectics in China" [〔21AKS003〕])